Plans to secure an unprotected section of the town’s waterfront still requires planning sign off.
Poole flood defence construction delayed until 2026

Plans to secure an unprotected section of the town’s waterfront still requires planning sign off.
Copyrights © 2025 Construct AI All Rights Reserved